The new connection will considerably relieve road traffic thanks to the intensified use of rail networks. Up to 240 truckloads per week can be fulfilled via rail transport. As rail transportation is a less carbon-intensive logistical option, this leads to considerable CO2 savings. For each truck shifted, 1.05 tons of CO2 are saved, up to 250 tons per week and as much as 11,500 tons per year. In combination with DHL Freight's GoGreen Plus service for pick and delivery customers get the opportunity to reduce the emission for their land transport significantly.
Deutsche Post DHL Group is constantly pursuing its goal of reducing all logistics-related emissions to net zero by 2050. The new train connection is expected to be another effective element in achieving this important goal and represents a firm step forward in their sustainability strategy.
- 温岭市DHL国际快递邮寄中心 2024-11-15
- 瑞安市DHL国际快递 瑞安市DHL国际快递服务中心 2024-11-15
- 乐清市UPS国际快递 乐清市UPS国际空运物流到门 2024-11-15
- 乐清市联邦国际快递 乐清市联邦国际快递服务中心 2024-11-15
- 乐清市DHL国际快递 乐清市DHL国际快递邮寄中心 2024-11-15
- 龙泉市UPS国际快递 龙泉市UPS国际快递服务中心 2024-11-15
- 龙泉市联邦国际快递寄件网点 2024-11-15
- 龙泉市DHL国际快递 龙泉市DHL国际快递物流中心 2024-11-15
- 舟山市DHL国际快递 舟山市DHL国际快递物流中心 2024-11-15
- 绍兴市DHL国际快递 绍兴市DHL国际快递取件服务 2024-11-15